Tuesday 24 March 2015

Barn build days ten and eleven





Day ten was spent laying and levelling the subfloor

All ready for the concrete
right hand side of the roof was this mornings work 

left hand side on after lunch
All that is left to do is put the flashing on, then its time to lay the concrete floor. Then at last the front panel and door will go on and the barn will finally be finished, may be by the weekend!!!!!!!!

No comments:

Post a Comment